Requirements for 1. construction site environment
The installation site of high pole lamp should be flat and spacious, and the construction site should have reliable safety protection.
Protection measures, installation site 1.5 pole length radius to do effective isolation, prohibit non-construction personnel
Enter, construction personnel to do a good job of safety protection measures, to ensure the safety of the life of construction personnel
Safety use of construction machines and tools;

Preparation of 2. equipment and auxiliary materials
When the equipment enters the site, the material management personnel shall inspect the goods according to the delivery list issued by the supplier,
Delivery to designated locations as required.
Auxiliary materials are: 1, sleepers; 2 oil; 3, 14mm diameter steel wire
Two ropes of 8 meters each, one steel wire rope of 8mm diameter 4 meters, and match the corresponding
Steel wire card; 4, anti-skid anti-scratch with a number of linen;

Selection of 3. construction equipment
The main machine for installing high pole lamps includes: 1 crane above 25T; 2, 5T
And 2T chain block each; 3, 8 pounds sledgehammer; 4, big board hand (enough twist
For anchor bolts and nuts) one; 5. A set of commonly used small tools;

4. construction steps
1. When lifting the high pole lamp from the transport vehicle, follow the flange of the high pole lamp close to the foundation, and then
The sections are arranged in descending order (to avoid unnecessary handling when the sections are inserted);
2. Fix the bottom joint light pole, wear the main wire rope, and use a crane (triangle can also be used
Frame chain block) Hoist the second section of the light pole into the bottom section, and use the chain block to tighten, do
To the internode seam tight, straight edges and corners. If there are sections 3 and 3, insert them in the same way.
Section III, Section IV.
Before inserting the best section, be sure to put the hook ring and lamp plate correctly (distinguish between front and back).
For integral type, insert in advance before inserting the last section light pole;
3. Fitting Parts: A. Transmission System: Mainly Including Winch, Wire Rope, Sliding
Wheel bracket, pulley and safety device; The safety device is mainly the fixation of 3 travel switches.
And the connection of the control line, the position of the travel switch must meet the requirements, it is to ensure that the line
An important guarantee for the timely and accurate action of the switch; B, suspension device, mainly three
Only the correct installation of the hook and the hook ring, and the installation of the hook should be adapted to the light pole.
The gap, to ensure the free hanging; Hook ring must be set before the last section of light pole
On. d; Protection system, mainly rain cover and lightning rod installation.

5. hoisting
After confirming that the socket is firm and the parts are installed as required, the lifting shall be carried out.
Pack. When hoisting, a, safety shall be achieved, the site shall be blocked, and the staff shall be well protected. B,
Test the performance of the crane before hoisting to ensure safety and reliability;
The person hanging should have the corresponding qualification; C, be sure to hang the light pole to play a good risk, prevent sets of joints
The joint falls off under force during lifting.

6. lamp panel and light source electrical appliance assembly
After the lamp pole is erected, install the circuit board and connect the power supply, motor line and travel switch line (see
According to the circuit diagram), the next step is to assemble the lamp panel (split type), and the assembly of the lamp panel is generally based on
High-rod lamp winding mechanical power; Good light source electric
of.

7. debugging
Main debugging items: A. debugging of light poles. The light poles should have accurate verticality,
General deviation can not exceed 1‰; B, lifting system debugging, to do the lifting
Smooth, unhook and hook freely. The debugging of C light source electrical appliances is mainly to ensure that each luminous body can be
Normal and effective work;
8. considerations
A, must have trained qualified professionals to do high pole lamp lifting operation;
B, when operating the high pole lamp lifting must be more than five meters away from the high pole lamp, and must have
Two or more persons operate simultaneously;
C, note: high pole lamp structure in various forms, different functions, installation risk is very
Large, in the specific operation must be under the guidance of the manufacturer's dedicated personnel, according
The actual situation of installation and construction.

Zhongshan Quanhui Outdoor Lighting Co., Ltd.Founded in 2004, it is a comprehensive lighting enterprise integrating production, sales and installation,
20 years focused on production:Municipal street lamp,landscape lamp,Garden lights,high pole lamp,Smart street lampSuch as outdoor landscape lighting lighting project.
Previous Page
Related News